Action scheduled
Poor workmanship still a hazard to humans and livestock
Reported via mobile in the Road surface issue category anonymously at 23:27, Saturday 4 July 2026
Sent to Shropshire Council less than a minute later. Council ref: 14214817.
The road had small holes filled in , ineffectively, poor workmanship, holes are getting larger already , and all the Kirb edges have been smashed and broken at the lower end opposite Dorway farm ., the hole road was agreed to be resurfaced not patched ! And it had only been patched which has not fixed the problem for pedestrians, vehicles , or livestock been a danger to life and health hazard and still a vet invoice is to be paid for causing halm due to bad roads and workman ! The top Of the road opposite the old bake house in the junction there used to be mirror on The large telegraph pole that was smashed and never replaced which also causes a danger to life been a bad blind junction ‘ parish are aware
Updates
-
Thank you for contacting us. This note is to confirm that we have received your report and we'll be in touch with an update as soon as possible.
Posted by Shropshire Council at 23:27, Saturday 4 July 2026
-
Our response to a pothole report will depend upon several factors. These include the severity of the defect, how busy the road is and its proximity to other defects or hazards.
We have very limited resources and budget. At times of high demand- such as emergency storm situations- we may take longer to respond than we would prefer.
We are also mindful of other works planned for the road. This includes external contractors or utilities and our long term road renewal program.
Temporary repairs may be applied on very busy roads where special traffic management or further investigation may be needed or in an emergency situation. Repairs may be completed in stages, not all at once.
The road will continue to be regularly inspected as per our policy. If the pothole becomes an imminent danger, please call our customer call centre on 0345 678 9006, giving your report reference number, and the situation can be reassessed.
To read more about what constitutes a safety defect and how we are managing pothole repairs, please see our website here: https://next.shropshire.gov.uk/ roads-and-highways/
Posted by Shropshire Council at 23:27, Saturday 4 July 2026
-
We have now arranged for the required work to take place to resolve the issue you reported to us.
We will update you when the work has been completed.
State changed to: Action scheduled
Posted by Shropshire Council at 09:06, Wednesday 8 July 2026
Only the original reporter may leave updates. If you made the original report please log in to leave an update.