You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Crater hole across full width of single track lane, loose tarmac all over lane, sharp crater edges unavoidable

Reported via iOS in the Pothole in a road category anonymously at 15:44, Thu 14 August 2025

Sent to Shropshire Council less than a minute later. Council ref: 14182741.

Abbey Lane is a single track lane, the heavy plant vehicle traffic has opened up what was a large pot hole to now an unavoidable crater covering the width of the lane, it is unavoidable as the verges are high and overgrown, loose tarmac is all over the lane Please repair with a matter of urgency

Updates

  • Thank you for contacting us. This note is to confirm that we have received your report and we'll be in touch with an update as soon as possible.

    Posted by Shropshire Council at 15:44, Thu 14 August 2025

  • We have now arranged for the required work to take place to resolve the issue you reported to us.

    We will update you when the work has been completed.

    State changed to: Action scheduled

    Posted by Shropshire Council at 16:02, Tue 26 August 2025

  • We have begun work on site but work had to be suspended. We will attend site again as soon as possible. We are unable to give you a timescale for this work but we will update you when action has been taken.

    Posted by Shropshire Council at 10:59, Wed 24 September 2025

  • We're pleased to advise you that this work has now been completed.

    State changed to: Fixed

    Posted by Shropshire Council at 12:59, Wed 24 September 2025

Only the original reporter may leave updates. If you made the original report please log in to leave an update.