You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Pot hole from the recently repaired tarmac on Woodbridge (Broseley side). The drain is not effective and needs clearing as this causes puddles which is lifting the tarmaced repair that was done. There is a pothole and then further decay to the road which is dangerously exposing the ironworks of the drains. This needs fixing asap!

Reported via mobile in the Carriageway pothole category anonymously at 09:12, Monday 10 February 2025

Sent to Shropshire Council less than a minute later. Council ref: 14169323.

Repair was done late 2024 and the tarmac started to erode/lift after storms only a few months later.

The issue is the drain is not clearing storm water and causing floods/puddles at this location. The constant water is weakening the tarmac and now there is a deep, deep pothole as well as exposed and sharp ironwork from the drains. There is no alternative road space to navigate due to the narrow one way bridge.

Updates

  • Thank you for contacting us. This note is to confirm that we have received your report and we'll be in touch with an update as soon as possible.

    Posted by Shropshire Council at 09:12, Monday 10 February 2025

  • We're pleased to advise you that this work has now been completed.

    State changed to: Fixed

    Posted by Shropshire Council at 15:18, Thursday 27 February 2025

Only the original reporter may leave updates. If you made the original report please log in to leave an update.