You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Drains blocked causing flooding.

Reported via desktop in the Drain blocked category by Cllr Kevin Pardy at 19:06, Thu 17 October 2024

Sent to Shropshire Council less than a minute later. Council ref: 14157972.

Flooding in this cul-de-sac is a regular occurrence, once resulting in an evacuation of residence and property repair.

Severn have identified a blockage within the drainage network caused by concrete, therefore the situation is exacerbated.

Updates

  • Thank you for contacting us. This note is to confirm that we have received your report and we'll be in touch with an update as soon as possible.

    Posted by Shropshire Council at 19:06, Thu 17 October 2024

  • We have now arranged for the required work to take place to resolve the issue you reported to us.

    We will update you when the work has been completed.

    State changed to: Action scheduled

    Posted by Shropshire Council at 15:04, Tuesday 25 March 2025

Only the original reporter may leave updates. If you made the original report please log in to leave an update.