Roundabout full of broken bricks and potholes and 3/4 foot weeds!
Reported via mobile in the Flower/Shrubs bed problem category anonymously at 18:48, Tue 21 May 2024
Sent to Shropshire Council less than a minute later. Council ref: 14147007.
Island area cracked and full of potholes and the roundabout left with 3/4 feet high weeds.
Despite the verges nearby being cut (not with the correct machinery just a strimmer so the mess left behind looks worse than the grass before that needed cutting!)
The surrounding verges were cut (although a strimmer was used leaving a big mess the entire length of the road) so why was the disgraceful route about the entrance to Bridgnorth and first thing people see just left. The weeds are now 3/4 high.
Updates
-
Thank you for contacting us. This note is to confirm that we have received your report and we'll be in touch with an update as soon as possible.
Posted by Shropshire Council at 18:48, Tue 21 May 2024
-
We have now arranged for the required work to take place to resolve the issue you reported to us.
We will update you when the work has been completed.
State changed to: Action scheduled
Posted by Shropshire Council at 13:13, Wed 22 May 2024
-
We're pleased to advise you that this work has now been completed.
State changed to: Fixed
Posted by Shropshire Council at 21:33, Mon 1 July 2024
This report is now closed to updates from the public. You can make a new report in the same location.