You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Blocked drain causing debris to run onto caravan pathway

Reported via mobile in the Drain blocked category anonymously at 15:37, Monday 18 March 2024

Sent to Shropshire Council less than a minute later. Council ref: 14141428.

A blocked drain has caused the soft verge to give way allowing water and debris run off the road. This new gully in the soft verge is in direct line with the footpath and grassed area near our static caravan. The footpath and the first step has been covered in a clay type substance, which must have flowed off the road due to the exceptional heavy rain we have had in the past months. The path and step is now a slip hazard, as trying to scrap off the clay type substance is very difficult due to the wet conditions and the continuing water running of the road.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for contacting us. This note is to confirm that we have received your report and we'll be in touch with an update as soon as possible.

    Posted by Shropshire Council at 15:37, Monday 18 March 2024

  • We have now arranged for the required work to take place to resolve the issue you reported to us.

    We will update you when the work has been completed.

    State changed to: Action scheduled

    Posted by Shropshire Council at 11:07, Friday 12 April 2024

  • We're pleased to advise you that this work has now been completed.

    State changed to: Fixed

    Posted by Shropshire Council at 15:34, Wednesday 7 August 2024

Only the original reporter may leave updates. If you made the original report please log in to leave an update.